
BlueDAG University – Creating Site Reports
In this video, Victor Felix, BlueDAG’s Director of Content and Compliance, will teach viewers how to create site reports in the BlueDAG portal.
In this video, Victor Felix, BlueDAG’s Director of Content and Compliance, will teach viewers how to create site reports in the BlueDAG portal.
ADAS 2010 604.2 Water Closet Location The water closet shall be positioned with a wall or partition to the rear and to one side. The …
ADAS 2010 604.7 Water Closets and Toilet Compartments Dispensers Toilet paper dispensers shall comply with 309.4 and shall be 7 inches minimum and 9 inches …
ADAS 2010 308.2.1 Unobstructed Forward Reach Where a forward reach is unobstructed, the high forward reach shall be 48 inches maximum and the low forward …
ADAS 2010 602.5 Drinking Fountain Spout Location The spout shall be located 15 inches minimum from the vertical support and 5 inches maximum from the …
ADAS 2010 505.5 Handrail Clearance. Clearance between handrail gripping surfaces and adjacent surfaces shall be 1 1/2 inches minimum. Code according to 2010 ADAS. Check …
ADAS 2010 407.2.2.2 Elevator Signal Location. Visible signal fixtures shall be centered at 72 inches minimum above the finish floor or ground. The visible signal …
ADAS 2010 503.3 Passenger Loading Zones Access Aisle Passenger loading zones shall provide access aisles complying with 503 adjacent to the vehicle pull-up space. Access …
ADAS 2010 407.2.3.1 Elevator Floor Designation Floor designations complying with 703.2 and 703.4.1 shall be provided on both jambs of elevator hoistway entrances. Floor designations …